Lot 51 - Drainage 2nd BA including lifting station
Landestheater Altenburg, Theaterplatz 19, 04600 Altenburg, renovation of stage machinery and logistical development
Lot 51 - Drainage 2nd BA including lifting station
—
- construction site equipment
- Clearing the construction site
15 m3 demolition of structures
Secure 80 m building and wall
Pick up 45 m of natural stone shelves and store them temporarily
Pick up 2 pieces of road inlets
Pick up 2 pieces of manhole covers
- Pick up surfaces
Taking up 22 m2 of bitumen pavement
Pick up 280 m2 of small paving made of natural stone and store it temporarily
Pick up 180 m2 of large slag pavement and store it temporarily
Accommodate 22 m2 of natural stone paving gutter
Accommodate 12 m2 of concrete slabs
Pick up 50 m2 of concrete pavement
Pick up 50 m2 of sand-sludged gravel cover
Pick up 14 m2 of large natural stone flats and store them temporarily
580 m2 of pavement
- Regenwasserleitung
Removing 80 m of drainage pipes
365 m3 excavated earth
90 m3 Bettungsschichten
60 m3 stabilization pipe trench
270 m3 Restverfüllung
125 m Open dewatering
93 m HS-Rohr DN 160
32 m HS-Rohr DN 200
4 pieces concrete shaft DN 1000
1 piece PE energy converter shaft DN 800
- Schmutzwasserleitung
Removing 80 m of drainage pipes
360 m3 excavated earth
90 m3 Bettungsschichten
53 m3 stabilization pipe trench
113 m Open dewatering
33 m HS-Rohr DN 160
42 m HS-Rohr DN 200
38 m HS-Rohr DN 250
7 concrete shaft DN 1000
1 piece PE energy converter shaft DN 800
- Earthworks, lifting station
120 m3 excavated earth
18 m3 Überdeckungsschichten
12 m3 stabilization of pipe trenches and shaft structures
2 m3 Sohlbeton
100 m3 Restverfüllung
1 piece pump system
1 piece of closed groundwater drainage
65 m2 sheet piling
3 m HS-Rohr DN 110
15 m HS-Rohr DN 160
22 m Kabelschutzrohr DN 110
1 piece PE energy converter shaft DN 800
-Road construction
Loosen 60 m3 of soil
Profiling and compacting 700 m2 of underlays
320 m3 Frostschutzschicht
4,6 to Asphalttragschicht
21 m2 Asphaltbetondeckschicht
-Lifting device
1 piece pumping station double system complete with shaft module for underground installation
1 piece open-air cabinet with control and backflow loop
4 m selbstregulierende Rohrbegleitheizung
3 m mineral wool insulation for d 90 mm
12 m Druckrohrleitung PE d 90 mm
10 m ventilation pipe PE d 110 mm