Construction and modernization of bus stop infrastructure and digitization of public services in urban public transport
Construction and modernization of bus stop infrastructurePart I: includes:
1) Delivery and assembly of 27 bus shelters of various sizes (from 2 to 3 spans) with a steel structure (columns made of profiles with a cross-section of at least 40mm x 40mm x 3mm) with glazed walls, polycarbonate roof and aluminum showcases for timetables. Showcases are to be equipped with a lighting installation,
2) Additional tasks:
a) disposal of 25 bus shelters that are not suitable for further operation,
b) delivery of 74 pieces of plates with the name of the stop and installation on the posts above the D-15 road sign,
c) delivery of 100 pcs. trash cans and installation at indicated communication stops on posts with the D-15 road sign,
d) performing construction and road works by making or supplementing the cobblestones of part of the platforms and restoring the places where the shelters were placed to proper technical condition.
Digitalisation of public services in urban collective transportThe digitalisation of public services in urban collective transport includes:
Task I, including in particular:
1) Delivery and implementation of the public transport toll collection system along with the delivery and installation of mobile validators to handle transactions using contactless mobile payments using an EMV card and a city card, delivery and implementation of the City Card System with an e-purse,
2) Provision of maintenance services and removal of defects during the warranty period; maintenance of the toll collection system, the City Card System.
Task II:
1) Delivery and implementation of a system for ticket control and debt collection with peripheral devices,
2) Provision of maintenance services and removal of defects during the warranty period; maintenance of the system for ticket control and debt collection.