Construction services Ernst-Abbe-Platz, 07743 Jena
Track construction:
- demolition of 210 m track+1 turnout including covering
- Installation of 210 m track (ORTEC VIBREX) on reinforced concrete longitudinal beams
- Installation of 1 switch on mass-spring system
- 650 m² track cover concrete base layer, asphalt top layer, paving surface layer
stops:
- Dismantling 2 platforms 600 m² superstructure, 115 m platform edge
- 300 m² superstructure paving construction
- 105 m platform edge granite board
- 280 m² asphalt superstructure
Driving signal system:
- dismantling of existing traffic signal system and switch control
- Delivery and installation of a driving signal system in SIL 2
- Delivery and installation of a dual switch heating control
- Delivery and assembly of four signals using LED technology
- Connection of FSA and heating control to existing telecontrol control technology according to IEC protocol
- Expansion of visualization (control center)
- approx. 1600 m — cable system for signal and control cables
- approx. 500 m fiber cable
- Network expansion for signal technology
catenary system:
- 675 m dismantling and new single overhead line construction including tensions