Road construction work, bridge construction work.
Road construction work, bridge construction work
Bridge construction work BW 55
- Demolition of the existing structure (2 sub-structures with a total of approx. 400m2 bridge area);
- Replacement construction (2 partial structures with a total of approx. 500m2 bridge area);
- Anchored pile pile wall in the central reservation;
Earthworks and road construction in the course of the A3
- Adjustment of the lane widths in the area of the bridge to the 6-str. Expansion;
- Partial construction of the noise protection wall in the area of the bridge;
- Construction of the new road drainage in the area of the bridge;
Earthworks and road works in the course of the subordinate road;
- Traffic safety work (closures, etc.);
- sheeting work;
- Complete expansion and renewal of Universitätsstrasse in the area of the bridge, including sidewalks and cycle paths;
- Renewal of the ceiling on Universitätsstrasse outside the bridge area.