The school building at Schulstraße 15 is being renovated. The town hall is newly integrated.
The building complex consists of three sections.
Building section A (BA 1) includes basement, ground floor, 1st floor, 2nd floor, attic (not included here)
Building part B (BA 2) (façade height 10m) includes ground floor, 1st floor, 2nd floor, attic (not included here)
Building section C (BA 3) Gymnasium (THIS ANNOUNCEMENT).
Building section D (BA 3) Gymnasium – intermediate building and social wing (THIS ANNOUNCEMENT).
For the exact scope, please refer to the bill of quantities
This is the work on the tendered interior doors in component C+D