Development of the outer harbor: deepening dredging 80,000 m
Implementation of heavy pontoons and pleasure craft.
Shoreline recovery: 310 ml.
Creation of a 20 m × 50 m slipway.
Roads various networks: 14,000 m
The purpose of this contract is to develop the eastern outer port of Ouistreham, it essentially consists of:
- the deepening dredging of the front;
- Harbor,
- the embankment and repair of the banks,
- the reorganization of port facilities (demolition of the existing slipway and booms, supply and installation of four heavy pontoons and a set of pleasure pontoons, creation of a new launching slipway);
- redevelopment of all the networks and roads of the adjoining median in connection with the EMR maintenance base under construction.