Borlänge Energi needs to have a new fuel management system installed for boiler P8. Includes fuel reception, fuel preparation and transportation to the boiler's fuel pockets.
NB: It is a requirement that the tenderer has acquired full knowledge of the Site through a visit before submitting a tender. See document Request, pkt 3.1
The procurement is carried out as a negotiated procedure above the threshold without prior announcement. Prequalification takes place in connection with the evaluation.
Borlänge Energi needs to have a new fuel management system installed for boiler P8. Includes fuel reception, fuel preparation and transportation to the boiler's fuel pockets.
NB: It is a requirement that the tenderer has acquired full knowledge of the Site through a visit before submitting a tender. See document Request, pkt 3.1