The contract regulates the conditions for the delivery of 2 static converter blocks including transformers and the connections to the 220 kV 50 Hz network and the 132 kV 16.7 Hz network in accordance with the detailed specification.
The scope of services includes the following:
- project planning;
- production;
- factory test;
- transportation;
- construction (housing FU);
- Assembly;
- Installation;
- training;
- documentation.
We have not yet received the measurement data from the Regensdorf node from Swissgrid. This data will be supplied later.
The contract regulates the conditions for the delivery of 2 static converter blocks including transformers and the connections to the 220 kV 50 Hz network and the 132 kV 16.7 Hz network in accordance with the detailed specification.
The scope of services includes the following:
- project planning;
- production;
- factory test;
- transportation;
- construction (housing FU);
- Assembly;
- Installation;
- training;
- documentation.
We have not yet received the measurement data from the Regensdorf node from Swissgrid. This data will be supplied later.