Civil engineering works - Redevelopment of the crossroads with Avenue de la Paix - Widening of the gauge of Boulevard Grande-Duchesse Charlotte - Construction of two engineering structures: o Access ramp to the underground car park o Retaining wall along the Cité Salvador Allende - Pipe work - Water pipe work - Dry network work - Concrete (Engineering structures) 1450.00 m3 - Earthworks: 28.000,00 m3 - Embankment: 18.000,00 m3 - Sidewalk slabs: 930,00 m2 - Curbs: 1250,00 m - Asphalt: 5200,00 to - Pipe work (wastewater and rainwater) 850,00 m - Water pipe work 300,00 m - Dry network work 500.00 m start / duration of work: November 2022 / 270 working days
Civil engineering works - Redevelopment of the crossroads with Avenue de la Paix - Widening of the gauge of Boulevard Grande-Duchesse Charlotte - Construction of two engineering structures: o Access ramp to the underground car park o Retaining wall along the Cité Salvador Allende - Pipe work - Water pipe work - Dry network work - Concrete (Engineering structures) 1450.00 m3 - Earthworks: 28.000,00 m3 - Embankment: 18.000,00 m3 - Sidewalk slabs: 930,00 m2 - Curbs: 1250,00 m - Asphalt: 5200,00 to - Pipe work (wastewater and rainwater) 850,00 m - Water pipe work 300,00 m - Dry network work 500.00 m start / duration of work: November 2022 / 270 working days