site scheduling, management and coordination mission (OPC) relating to the project to rehabilitate and extend the municipal theatre of Bastia integrating the conservatory of music, dance and dramatic artThe project includes not only a heavy and in-depth rehabilitation of the premises of the existing theatre, with the removal of extensions altering the heritage value, where the levels are entirely taken over and rationalised, but also, A new steel and glass extension on the rise to house the Conservatory of Music, Dance and Dramatic Art. The new facility will offer a 774-seat auditorium, as well as an auditorium with approximately 200 seats. Floor space: 8025 square metresEstimated cost of works at the APD stadium: 27,831,100 euro(s) (excl. VAT).
site scheduling, management and coordination mission (OPC) relating to the project to rehabilitate and extend the municipal theatre of Bastia integrating the conservatory of music, dance and dramatic artThe project includes not only a heavy and in-depth rehabilitation of the premises of the existing theatre, with the removal of extensions altering the heritage value, where the levels are entirely taken over and rationalised, but also, A new steel and glass extension on the rise to house the Conservatory of Music, Dance and Dramatic Art. The new facility will offer a 774-seat auditorium, as well as an auditorium with approximately 200 seats. Floor space: 8025 square metresEstimated cost of works at the APD stadium: 27,831,100 euro(s) (excl. VAT).