The subject of the contract is the construction of a bridge over the San River along with the construction of access roads and an intersection with the provincial road No. 886 (Królowej Bony Street) – Stage II.
The order will be executed on the basis of the decision on the permit for the implementation of the road investment (ZRID) No. 1/23 of 31.03.2023.
The scope of the contract includes:
1) construction of a single-carriageway municipal road No. G117077R Jana III Sobieskiego Street (1/2) from the existing intersection with the municipal road No. G 117077R Żwirki i Wigury/Zamkowa Street to the designed bridge (abutment),
2) extension of the voivodeship road No. 886 dual carriageway (2/2) on the section from the intersection with A. Mickiewicza Street to the designed roundabout and single carriageway (1/2) from the designed roundabout to the end of the development with a length of 300 m along with the infrastructure,
3) construction of a turbine roundabout along the provincial road
4) construction and reconstruction of pedestrian, bicycle and bicycle paths,
5) extension of the intersection with infrastructure,
6) construction and reconstruction of individual exits,
7) construction, extension, reconstruction and demolition of the rainwater sewage system with a shore outlet,
8) construction, reconstruction and demolition of medium and low voltage power grids,
9) construction of a cable power network for road lighting,
10) construction, extension, reconstruction and demolition of the low-pressure gas network,
11) construction, extension, reconstruction and demolition of the heating network,
12) construction, extension, reconstruction and demolition of the water supply network,
13) construction, extension, reconstruction and demolition of the sanitary sewage system,
14) construction, extension, reconstruction and demolition of telecommunication equipment,
15) construction of a technological channel,
16) felling of trees and shrubs that interfere with the designed scope of road works,
17) planting trees and shrubs.