The order includes the renovation or disposal of pollutant building materials/parts of the east wing and pavilions and subsequent complete dismantling.
asbestos
— roofing 575 m
— PVC floor coverings 350 m
— lino floor coverings 275 m
— mastics in wooden window elements 25 pcs.
— flange seals 120 pcs.,
— seals in NH fuses of electrical installation,
— dividing plates in ELT distribution boxes 22 pcs,
— wall plaster and paint 2 200 m
KMF
— insulation 575 m
— overlay of ceiling coverings 300 m
— WaDaE on pipelines 1,200 m,
— WaDaE in pipeline penetrations 250 pcs,
— plastic floor coverings 1 050 m
— impact sound insulation approx. 2 100 m
— stuffing wool in window/door connections 1,500 m
PCB
— capacitors in luminaires.
PAK
— asphalt tiles 200 m
— horizontal lock 525 m
— felt under mastic asphalt approx. 500 m
— components of the building waterproofing.
heavy metals
— lead sewer pipes 100 m.
wood preservative
— doors, furniture, construction woods, 14 t.
Demolition of eastern construction with pollutant remediation.