TUM Garching ZQE - new center for quantum engineering.
In the outdoor areas on non-public land, the following are displayed:
- Relocation of the waste water collector and well water collector from the future construction pit area of the ZQE.
The two main collectors must be laid between the construction pit bored pile wall and the existing media channel. The bottom of the canal is up to 5 mu ground level. The center distance SW and RW is approx. 1 m. Due to the groundwater level of up to 469.00 m above sea level, both sewer pipes must be protected against buoyancy with a concrete coating. The new software channel is led through 6 inspection shafts. The newly constructed well water sewer will be led around the future excavation pit via 4 inspection shafts.
- Relocation of drinking water and service water pipeline, existing water quality (building 5111):
—— PE HD DN 200 pipeline: 25 m;
—— Pipeline Stz DN 300 to 600: 55 m;
—— Be pipeline DN 300 to 500: 55 m;
—— Manhole DN 1000, depth up to 2.00 m: 2 pieces;
—— Manhole DN 1500, depth 5.00 m: 10 pieces;
—— Excavation canal up to 3.00 m: 120 m
—— Excavation canal up to 5.00 m: 790 m
—— Excavation shafts up to 3.00 m: 24 m
—— Excavation shafts up to 5.00 m: 270 m
—— PE-HD pipe DN 110, PN 16, BW + TW: 230 m.