New construction of the administration building as a reinforced concrete structure with flat slabs, columns, walls and stairs
with basement, ground floor, 2 upper floors and attic, as well as a 4th floor in the attic
with a gross floor area of 8,175 m2 and a BRI of 34,985 m3
with the main geometry length 78m x width 42m x 28m height (below and above ground)
Main mass concrete: approx. 5500m3
Main mass steel: approx. 700 tons
New construction of the administration building as a reinforced concrete structure with flat slabs, columns, walls and stairs
with basement, ground floor, 2 upper floors and attic, as well as a 4th floor in the attic
with a gross floor area of 8,175 m2 and a BRI of 34,985 m3
with the main geometry length 78m x width 42m x 28m height (below and above ground)
Main mass concrete: approx. 5500m3
Main mass steel: approx. 700 tons