- earthworks (1 500 m
- civil engineering works (1,200 m empty pipe packages, 40 cable ducts),
- Concrete works (300 St. FT small foundations, 200 m
- earthworks (1 500 m
- civil engineering works (1,200 m empty pipe packages, 40 cable ducts),
- Concrete works (300 St. FT small foundations, 200 m