All activities required to complete the work in accordance with the contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in:
In particular this includes, but is not limited to, the following:
• tie-in to the existing system being in operation. This means that a separation typically consists of one valve. Energinet will here check the tightness of the valve before the operation is carried out;
• tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves;
• tie-in between two newly constructed sections with no connection to gas system in operation. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts.
The contracting authority wants to purchase the works for establishing Tie-ins to Baltic Pipe.
All activities required to complete the work in accordance with the Contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in:
In particular this includes, but is not limited to, the following:
• tie-in to the existing system being in operation. This means that a separation typically con-sists of one valve. Energinet will here check the tightness of the valve before the operation is carried out;
• tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves;
• tie-in between two newly constructed sections with no connection to gas system in opera-tion. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts