New construction of a footpath and cycle path as well as an amphibian protection facility along the L 3111 between Viernheim and Hüttenfeld including repair of the roadway of the L 3111
Remove approx. 8,500 m of concrete edge strips
approx. 33,000 m² asphalt milling
install approx. 13,000 m² AC 32 TS
approx. 34,000 m² AC 16 BS
install approx. 34,000 m² AC 11 DS
approx. 6,000 m³ topsoil removal
produce approx. 3,600 m³ FSS
approx. 10,500 m² AC 22 TL produce
approx. 10.500 m² AC 5 DL restore
approx. 365 m² sandstone wall
approx. 1,900 m Amphibian guidance system including culverts