Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
31 July 2023
Closing Date:
28 August 2023
Location(s):
DEB35 Mainz, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Bürgerhaus Mainz-Lerchenberg trade: Drywall construction work without daycare center

Drywall construction work without daycare

The Mainz Bürgerhäuser GmbH & Co. KG intends to renovate the community center in the Lerchenberg district in terms of energy and fire protection, convert it and expand it with two extensions (daycare center and dance sports club).

The grounds of the community center Lerchenberg are located in Mainz's Lerchenberg district in a residential area. The property is extensive and is bordered by a large park-like forest to the south. In the upper northern part is the community center with an attached public car park. The entrances can be reached via northern Hebbelstraße on the one hand and via western Büchner Allee on the other.

The existing building will be preserved, converted and adapted to the required new uses through appropriate conversion measures. The building will be completely renovated and adapted to current usage requirements.

The required uses in the community center include the local administration, the district management, the youth center, the senior center and an optional restaurant.

The new construction of the planned 4-speed day care center will be added in the southeast and complements the citizen-oriented offer of the ensemble. The daycare center is closely linked to the Community Center - functionally but self-sufficient. The new kindergarten building will be single-storey, with a flat roof and a PV system. The new building of the hall of the dance sports center "Rot - Weiß" is connected to the existing building of the Bürgerhaus transversely to the main orientation in the south. This new building will also be equipped with a PV system.

In drywall construction, in addition to shaft and facing walls, mainly wall and ceiling constructions are installed. Plasterboard ceilings with square perforations and smooth border friezes are planned for the community center. In wet areas, smooth GK ceilings with ventilation joints are installed. Inspection flaps are installed in the edge frieze according to the planning.

Building data:

Building data for day-care center:

Total gross floor area GFA: approx. 1041.44m²

Total gross volume BRI: approx. 4056.13m³

GFA basement: 411.58m², height: 3.55m, BRI UG: 1461.109 m³

GFA EC: 629.86m², height: 4.12m, BRI EG: 2595.023m³

Number of floors: 2 full floors

Building data community center:

Total gross floor area GFA: approx. 3325.44m²

Total gross volume BRI: approx. 13240.138 m³

GFA basement: 1416.38m², height: 3.16m, BRI UG: 4475.7608m³

GFA ground floor: 969.80m², height: 3.57m, BRI EG: 3462.186m³

GFA EG Large Hall: 535.12m², Height: 7.25m, BRI EG Large Hall: 3879.62m³

GFA floor: 404.14m², height: 3.52m, BRI floor: 1422.5728m³

Number of floors: 3 full floors

Heights of the community center:

UG: OKFF -3.19 = +227.15 hours

UG OKRD -3.28 = +227.06UN

EC OKFF +0.00 = +230.34UNN

EC OKRD -0.10 = +230.24unn

OG OKFF +3.48 = +233.82UN

OG OKRD +3.37 = +233.71

Building data Tanzclub “Rot-Weiss”:

GFA: 640.67m², height: 5.92m, BRI: 3792.7664m³

Number of floors: 1 full floor

Heights dance club “red-white”:

EC OKFF +0.00 = +230.34UNN

EC OKRD -0.16 = +230.18UENn

Download full details as .pdf
The Buyer:
Mainzer Bürgerhäuser GmbH & Co. KG
CPV Code(s):
45000000 - Construction work
45324000 - Plasterboard works