Construction of a medium pressure category C gas pipe (MPC) in polyethylene tube (PE eight bars - diameter 160) from the municipality of Castelnau-de-Médoc to the municipality of Saint-Laurent Médoc, i.e. a total length of approximately 15 km.
The works include:
Studies and preparation:
- the project implementation plans;
- obtaining authorizations for works in the public domain;
- the technical notices of the works to be carried out;
- plans of passage of particular points;
- calculation notes;
- the nomenclature of materials;
- supply of materials and equipment;
- the sheets of materials and equipment to be implemented;
- reception of materials.
Works:
- picketing marking;
- all earthworks;
- directional drilling;
- laying of the polyethylene pipe;
- fitting of the shut-off valve, purge and accessories;
- topographical surveys of the works executed;
- mechanical resistance and tightness tests;
- drying of the pipeline;
- connection to the existing network;
- track repairs;
- fitting of the marking terminals.
Constitution of the end of work file:
- proofing plans;
- the nomenclature and the equipment reception reports;
- the qualifications of the personnel;
- the welding book;
- the proofs and drying reports;
- the road acceptance reports with the departments concerned.