Section-by-section dismantling and reinstallation of low-voltage electrical systems including the associated sub-distributors, lights and installation devices in the existing areas of the Elblandklinikum Radebeul.
- approx. 11,000 m of cables and lines,
- approx. 200 m cable support systems,
- approx. 220 pieces of installation devices,
- approx. 16 sub-distributors,
- approx. 110 pcs of lights,
- 1 pc BSV battery system for supplying the operating theater lights.