In the Herz-Jesu Hospital, the 4th floor in the ward block is being converted into a geriatric focus.
It is particularly pointed out that the renovation will be carried out during ongoing operation, the renovation area comprises approx. 1,000 square meters.
Thermal insulation work for the construction of a geriatric ward at the Herz-Jesu Hospital in Dernbach:
- 300 m of thermal insulation heating;
- 1,000 m of thermal insulation sanitary;
- 500 m
Fire protection work;
Disassembly work.