Quay construction work | Tenderlake

Quay construction work

Contract Value:
GBP 8M -
Notice Type:
Contract Notice
Published Date:
04 February 2019
Closing Date:
11 March 2019
Location(s):
UKC22 Tyneside (UK UNITED KINGDOM)
Description:

The proposed Works, situated at Tyne Car Terminal Berth No.3 at Port of Tyne, Tyne Dock, South Shields, are to accommodate larger vessels for an expanded Roll-on Roll-off facility.

The project involves the design, fabrication, installation and commissioning of a new pontoon to replace the existing pontoon which will support an existing link-span bridge and will be restrained by new restraint dolphins or mono-piles. The works also include the design and construction of new berthing dolphins, the design and installation of new fenders onto an existing jetty, the installation of new bollards and testing existing bollards, new handrails and the construction of a rock revetment. An existing restraint dolphin will need to be removed along with the existing pontoon and existing fendering from the jetty some of which has collapsed onto the bed of the river.



Infrastructure Conditions of Contract

Design and Construct Version

(ICC — August 2011)

Download full details as .pdf
The Buyer:
Port of Tyne Authority
CPV Code(s):
45111000 - Demolition, site preparation and clearance work
45241100 - Quay construction work