L 333, expansion between Pflegelberg and Primisweiler - new construction of the cycle path bridge over the Untere Argen.
- Remove and recycle topsoil: 285 m
- Create construction pit, utilize excavation: 600 m
- Delivery and installation of building material (gravel-sand mixture): 720 m
- Making concrete: 210 m
- Install reinforcing steel: 42 t.
—Install tensioning steel: 24.2 t.