Footbridge construction work | Tenderlake

Footbridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 February 2021
Closing Date:
24 March 2021
Location(s):
DE147 Bodenseekreis (DE Germany/DEUTSCHLAND)
DE148 Ravensburg (DE Germany/DEUTSCHLAND)
Description:
L 333, expansion between Pflegelberg and Primisweiler - new construction of the cycle path bridge over the Untere Argen

L 333, expansion between Pflegelberg and Primisweiler - new construction of the cycle path bridge over the Untere Argen.

- Remove and recycle topsoil: 285 m 3 ,

- Create construction pit, utilize excavation: 600 m 3 ,

- Delivery and installation of building material (gravel-sand mixture): 720 m 3 ,

- Making concrete: 210 m 3 ,

- Install reinforcing steel: 42 t.

—Install tensioning steel: 24.2 t.

Download full details as .pdf
The Buyer:
Regierungspräsidium Tübingen Ref. 47.3-Straßenbau Süd Dienstsitz Ravensburg
CPV Code(s):
45221113 - Footbridge construction work