New office and laboratory building (GO IN II) in the Potsdam-Golm Science Park.
- 1 St. Partial air supply laboratory approx. 42 500 m
- 6 pcs plastic exhaust fans for chem. contaminated exhaust air (approx. 12,000 m each
- 1 high-performance KVS module incl. Pump group, heating and cooling supply and integrated control,
- 1 St. Supply air device General approx. 5,300 m
- 1 piece exhaust air unit General approx. 5,300 m
- 1 high-performance KVS module incl. Pump group, heating supply and integrated control,
- 2 000 m
- 1 000 m ventilation pipes made of galvanized Stole,
- 500 m
- 150 m ventilation pipes made of PPs,
- Insulation of prescribed pipelines and channels with diffusion-tight insulation (outdoor and exhaust air) and mineral wool (supply air laboratory, exhaust air roof).