this consultation is launched, by the city of Noyon, to meet the need to modernize and make reliable the network infrastructure (necessary for the physical interconnection of the elements of the Lan) and assets (interconnection elements and software to control and administer the network) but also to rationalize the maintenance system of all equipment and anticipate future developments.
The contract is composed of two lots (lot 1: supply and installation of electrical wiring and lot 2: Supply, installation and maintenance of network, WI-FI and security equipment) of which each of the lots is a so-called "Composite" contract with two components: a "flat-rate" component composed of a firm tranche (25 sites identified) and 7 optional tranches (7 sites under the 7 optional tranches) and a "framework agreement with purchase orders" component, without minimum but with a maximum of 15,000 euro ht over the duration of the contract.
Lot 1: Supply and installation of computer cablingthis lot is composed of a firm slice (itself composed of two temporal phases) and 7 optional slices.
Each lot is also composed of a framework agreement with purchase orders, without minimum and with a maximum of 15,000 euros ht over the duration of the contract. Purchase orders will be issued as needed.
25 sites are concerned under the firm tranche: schools, cultural places, buildings. 7 sites are concerned under the optional tranches
Lot 2: Supply, installation and maintenance of network, WI-FI and security equipmentthis lot is a "Composite" market, divided into 2 parts: a "flat-rate" component composed of a firm tranche (representing 25 sites) and 7 optional tranches (7 sites), and a "framework agreement with purchase orders" component, without minimum but with a maximum of 15,000 euros ht over the duration of the contract. It will result in the issuance of purchase orders as and when needed.