Advisory and consultative engineering services | Tenderlake

Advisory and consultative engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 December 2022
Closing Date:
26 January 2023
Location(s):
FR106 Seine-Saint-Denis (FR FRANCE)
Description:
Paul Eluard urban renewal project in Bobigny: Scheduling, Piloting, and Intersite Coordination (Opcic) missions - lot 1 site environment monitoring missions - lot 2

this consultation concerns scheduling, steering and inter-site coordination missions (Lot 1), and site environmental monitoring (Lot 2) for the Paul Eluard urban renewal project (Pru) in Bobigny.The Framework Agreement is concluded without a minimum price and with a maximum price of:- 260 000 euro(s) Ht for lot 1- 80 000 euro(s) Ht for lot 2the framework agreement is concluded, on its date of notification, for a period of 2 years renewable twice, but not exceeding 6 years

scheduling, steering and inter-site coordination missions

Spl Ensemble wishes to strengthen the expertise in the operational management of the project as a whole and, on a finer scale, of the operational sectors. The titular team will therefore ensure, at different operational scales:the establishment of planning and phasing book highlighting in particular the interfaces between operations and critical paths-establishment of a site organization regulation aimed at consolidating the technical feasibility of the sites, contractualizing and framing over time the access constraints, the limits of rights of way and the interfaces of simultaneous sites. Olanimation of a regular technical meeting of coordination of project owners whose main purpose is to discuss operational deadlines, interfaces between operations, and possible points of technical and/or calendar alertsocoordination and monitoring of construction sites in interfaces

Site Environmental Monitoring missions

The scope of the planned work, which will be carried out in an inhabited neighbourhood, requires that the environment of particularly rigorous construction sites be monitored for the sake of sustainable development. This monitoring of the construction site environment includes:- the ecological environment (soil degradation, infiltration of chemicals, etc.) - the urban environment (good performance of construction sites and surroundings; prevention of dust, noise, vibrations, olfactory nuisances, etc.) The various missions expected are: the drafting of "Low nuisance site" regulations, and the monitoring of construction sites to prevent and remedy any disorder

Download full details as .pdf
The Buyer:
spl ensemble
CPV Code(s):
71313000 - Environmental engineering consultancy services
71318000 - Advisory and consultative engineering services