The object of the order is a service consisting in the performance of conservation activities in the nature reserve (RP) of Novokuznitsky Pond. Description of the work: mechanical removal of the yellow gribbon together with the rhizome. The costs of biomass exportation and disposal are on the contractor's side — they must be included in the offer. Chemical agents are not allowed. Work size: approx. 0.2 hectares. Additional information: the surface of the area from which the yellow gribbon should be removed is a pond filled with water. The area is inaccessible from the mainland. It should be expected that the diameter of the rhizomes is significant and can be approximately 10 to 12 cm. The above should be taken into account when assessing the level of difficulty of the work. The average depth of the water table of the Novokuznitsky Pond is estimated at 0.8 m. However, attention should be paid to the discharge and accumulation of bottom sediments, as well as the development of the rhizomes of the yellow throng on almost the entire surface of the pond. The above should be taken into account when assessing the level of difficulty of the work.
The object of the order is a service consisting in the performance of conservation activities in the nature reserve (RP) of Novokuznitsky Pond. Description of the work: mechanical removal of the yellow gribbon together with the rhizome. The costs of biomass exportation and disposal are on the contractor's side — they must be included in the offer. Chemical agents are not allowed. Work size: approx. 0.2 hectares. Additional information: the surface of the area from which the yellow gribbon should be removed is a pond filled with water. The area is inaccessible from the mainland. It should be expected that the diameter of the rhizomes is significant and can be approximately 10 to 12 cm. The above should be taken into account when assessing the level of difficulty of the work. The average depth of the water table of the Novokuznitsky Pond is estimated at 0.8 m. However, attention should be paid to the discharge and accumulation of bottom sediments, as well as the development of the rhizomes of the yellow throng on almost the entire surface of the pond. The above should be taken into account when assessing the level of difficulty of the work.