The work will be carried out under:
- preventive maintenance or occasional treatment of embankments or rock walls that are not reinforced following the identification of a risk, with the construction of new structures;
- routine maintenance and repair of existing protective equipment against falling boulders or stones, namely more than 470 structures distributed along departmental roads;
- the immediate safety of an embankment, a structure, a rock wall, or emergency intervention twelve hours and this 365 days a year, following bad weather or unforeseeable geological events.
The work takes place mainly in acrobatic conditions requiring specific qualifications. This contract is allotted in two geographic lots.
South sectorSouth Sector:
- antennas of Laragne,
- Veynes,
- Gap,
- Saint-Bonnet.
North sectorNorth Sector:
- Briançon branches,
- Eygliers.