L509, Bellheim bypass, earthwork, drainage and superstructure work (3 + 100-4 + 230)
L509, area Bellheim, earthwork, drainage and superstructure work 3 + 100 - 4 + 230.
- 3 800 m 3rd Remove topsoil;
- 10 200 m 2nd Qualif. Soil improvement;
- 22,400 m 3rd Loosen and reuse the soil;
- 9,600 m 2nd Making the formation;
- 3,250 m 3rd Create an anti-freeze layer;
- 8 850 m 3rd Manufacture HGT;
- 9 200 m 2nd Asphalt base course AC 32 TS;
- 9 100 m 2nd Install AC 16 BS asphalt binder;
- 9 050 m 2nd Make the asphalt surface AC 11 DS.