Lot 13 - drywall construction 7.3
Lot 13: drywall work.
Gross amounts:
- 650 m 2nd Facing shells;
- 5 500 m 2nd Partitions GKB, GKBI, GKF;
- 100 m 2nd Installation walls;
- 200 m 2nd Shaft walls;
- 750 m 2nd Sloping ceilings GKB, GKBI, GKF;
- 40 m 2nd Perforated sloping ceilings;
- 550 pieces acoustic ceiling sail;
- 770 m 2nd Suspended ceilings metal cassettes;
- 480 m 2nd Drop ceiling wood;
- 230 pc internal doors, steel frame, wooden door leaf;
- 1 light lock.