Gradual commissioning of service phases 2-4 and 5-8, optional service phase 9 HOAI according to the sample contracts of RBBau. Total costs KG200-700 (without initial equipment), max. EUR 26,000,000 net (excluding VAT). The implementation of the project takes place in the ZBau process including the creation of an application and construction documents as well as a concept discussion with the donors.
Fixed price contract! Fee according to HOAI according to the sample contracts of RBBau. Commissioning LPH 5-8 at the earliest upon receipt of the approved application and construction documents. Fee zone (§56 HOAI): 1,2,3, fee rate (§56 HOAI): minimum rate.
Amount of the additional costs: acc. RIFT-Bund in the latest version
The conversion surcharge is: none - The building fabric to be processed is remunerated as follows: none
Remuneration for special services: none.
At the Fraunhofer Institute for Industrial Mathematics ITWM, the Fraunhofer Society intends to expand the existing institute building at the Kaiserslautern location by a further construction phase and to build an additional technical center. The extension has a usable area of approx. 2,780 m
The technical systems of system groups 4, 5, 6 and 7 are to be planned and their execution monitored. Equipment groups 6 and 7 include elevators, crane systems and media technology, among other things.
The Fraunhofer-Gesellschaft attaches great importance to the implementation of an innovative, sustainable and resource-saving, but at the same time economical building, energy and operating concept. The aim is to develop an energy concept that allows the building to be operated with as little additional CO2 emissions as possible.