The city of Laupheim plans to expand the existing industrial area of Laupheim-Ost to enable the establishment and expansion of commercial operations.
It is necessary to draw up a development plan, as there is as yet no planning right on the planned areas.
In the course of drawing up the development plan, an engineer for civil engineering is sought, who will handle the traffic facilities and the technical equipment such as B. plans the water supply and drainage within the commercial area. The project is to be implemented in several construction phases.
The reason for drawing up the development plan "Laupheim-Ost II industrial area, part 1" is the need to expand commercial operations. Since there are no commercial building sites available for the project, the existing Laupheim-Ost industrial estate is to be expanded to the south. This also enables other traders to relocate, relocate or expand.
The aim is to develop a well-connected commercial area that allows flexible use. This can create an offer for smaller or larger commercial companies. The good traffic connection is intended to prevent an additional burden on the city center.
On the basis of the information already available, a first development plan was drawn up. This plans an area of around 15.6 ha (see scope) and should serve as a starting point for starting the development plan procedure.
Approx. 12,500 m of it
The plan concept provides for access to the existing roundabout on K7582 and Ludwig-Bölkow-Straße. The selected development system will enable the area to be further developed over the existing streets in the future.
There are already walking and cycling paths around the planned area, which are to be continued, so that pedestrians can easily be reached or accessed.
On the subject of local public transport (public transport), a stop in the planning area is checked as part of the further planning and incorporated if necessary. This is important for the reduction of motorized individual transport (MIV) in the planning area and in the context of the city as a whole.
The eligible costs (KG 300 and 400) of the measure are estimated at EUR 4 750 000.
We are looking for an engineer for civil engineering for the planning and construction supervision services of engineering services from service phases 1-9 on the basis of HOAI 2013,
Sections 41-44 for engineering structures and Sections 45-48 traffic facilities as well as Sections 53-56 for technical equipment. The services include the planning and construction supervision of civil engineering measures, drinking water supply, drainage with separate sewerage, rainwater treatment, sewage pumping station with technical equipment, traffic facilities for roads and paths and information technology using broadband.
Estimated dates:
Bidder selection July 1, 2020 Request for an offer July 8, 2020 Submission date Fee offers August 8, 2020 Negotiations: August 21, 2020 Design planning and planning of the first construction phase should begin immediately after the order has been placed.