The company building (BGH) will receive a new underground car park to the east of Pfingstweidpark. The BGH will be dismantled down to the load-bearing structure and the existing basement to 4th floor will be statically strengthened. Two additional storeys will be built on top of the existing building, with a dominant cantilever in the direction of (north) Pfingstweidstrasse. The 6th floor will receive a new roof structure with waterproofing membranes, insulation layers and sheet metal connections. In addition, new fixtures will be created and the substrate will be landscaped.
The company building (BGH) will receive a new underground car park to the east of Pfingstweidpark. The BGH will be dismantled down to the load-bearing structure and the existing basement to 4th floor will be statically strengthened. Two additional storeys will be built on top of the existing building, with a dominant cantilever in the direction of (north) Pfingstweidstrasse. The 6th floor will receive a new roof structure with waterproofing membranes, insulation layers and sheet metal connections. In addition, new fixtures will be created and the substrate will be landscaped.