The work consists of: building a school group with a useful surface area of approximately 2,870m² on the site of the current elementary school. The future buildings will house the premises of the elementary school (11 classes), the nursery school (6 classes), the leisure reception (for about 120 children) and the catering area which will be sized to produce about 240 meals per day. The work will be carried out in 2 phases: construction of the new elementary premises, the leisure reception and the restoration then demolition of the existing buildings for the construction of the kindergarten premises. This consultation follows an unsuccessful outcome and concerns only lot no. 11 heating, geothermal ventilation and sanitary plumbing. Provisional work should begin: in June 2023
Heating ventilation geothermal and sanitary plumbingheat production by geothermal energy and distribution, radiant panels, water radiators, heat pumps, single and double flow ventilation, kitchen ventilation, plumbing (Ef, Ecs, Eu and Ev), sanitary appliances, regulation and Gtc