Renovation of the Kiel concert hall; Tubular frame doors and fire-resistant glazing
- Supply and installation of 4 x soundproof windows with fixed glazing and sliding element between the concert hall and the
Control cabin approx. 3,500 x 560 mm
- Supply and installation of 4 x double-leaf T-30 fire doors with glazed skylights, skylights and door leaves.
- Supply and installation of 2 x double-leaf smoke control door, door leaf glazed.
- Supply and installation of 3 x single-leaf T-30 fire doors, door leaves glazed.
- Supply and installation of 1 x soundproofing steel façade with fixed glazing, 8 panels, including 2 x double-leaf door.
- Supply and installation of 2 x double-leaf soundproof door, door leaf glazed.
- Supply and installation of 3 x electromagnetic hold-open system for 2-leaf door.
- Supply and installation of 2x holding magnets for keeping open for single-leaf doors.
- Supply and installation of two additional ceiling detectors.
- Installation of two electrically connectable panic locks
- Door stopper approx. 20 pieces
- Performance of all door elements
- Maintenance offer for all doors