B180_OU_ASL_BW 2.2, bridge structure and construction road 2.2
The following key benefit is included in the tender:
1.250 m² - Construction line
5 St - Rohrdurchlässe DN 400/500
55 m - Shoring, partially anchored
315 m² - Spundwandgründung
90 m² - Stahlbetonarbeiten
40 m - Füllstabgeländer
65 m² - Bitumen welding membrane
300 m² - Wasserbauarbeiten