The task co-finalised from the European Regional Development Fund under the Regional Operational Programme of the Silesian Voivodeship 2014-2020 (European Regional Development Fund) for priority axis: IV. Energy Efficiency, Renewables and Low Carbon Economy for Action: 4.1 Renewables for Subaction 4.1.1. Renewable energy sources — ZIT.
The subject of the Order is:
-delivery and installation of photovoltaic installations — a total of 158 installations,
- delivery and installation of solar collectors — total 58 installations.
Details of assembly for all locations can be found in Annex 5 — “Detailed description of the object of the order” and in the technical projects attached thereto.
The subject of the Order is:
a. Delivery and installation of photovoltaic installations with the implementation of the accompanying work specified in the OPZ, the commissioning of installed installations, the implementation of the procedure of incorporation into the OSD network, the conduct of the instruction for the Beneficiaries of the project (residents and users of the installation in locations indicated in OPZ) for installation handling and servicing of installations during warranty and warranty period. Photovoltaic installations with a total capacity of a minimum of 637,28kWp (0,63728MWe), which will be located on private properties owned by residents of the City of Będzin — a total of 158 installations:
- with a minimum capacity of 2.24 kWp — 21 pcs of installation
- with a minimum capacity of 2.52 kWp — 8 pcs of installation
- with a minimum capacity of 2.80 kWp — 11 pcs of installation
- with a minimum capacity of 3.08 kWp — 2 pcs of installation
- with a minimum capacity of 3.36 kWp — 17 pcs of installation
- with a minimum capacity of 3.64 kWp — 17 pcs of installation
- with a minimum capacity of 3.92 kWp — 2 pcs of installation
- with a minimum capacity of 4.20 kWp — 22 pcs of installation
- with a minimum capacity of 4.48 kWp — 12 pcs of installation
- with a minimum capacity of 4.76 kWp — 8 pcs of installation
- with a minimum capacity of 5.04 kWp — 9 pcs of installation
- with a minimum capacity of 5.32 kWp — 4 pcs of installation
- with a minimum capacity of 5.60 kWp — 4 pcs of installation
- with a minimum capacity of 5.88 kWp — 2 pcs of installation
- with a minimum capacity of 6.16 kWp — 4 pcs of installation
- with a minimum capacity of 6.44 kWp — 15 pcs of installation
b. Delivery and installation of solar collectors, including the implementation of the accompanying work specified in the OPZ, the commissioning of installed installations, the conduct of instruction for project beneficiaries (residents and users of the installation in the locations indicated in the OPZ) in the field of operation installation and servicing of the installation during the warranty and warranty period. Installations of solar collectors with a total capacity of a minimum of 223.30 kW (0.2233 MWe), which will be located on private properties owned by residents of the City of Będzin — a total of 58 installations:
- number of plates of collectors — 2 pcs., tank 200 l — 26 pcs of installation
- number of plates of collectors — 3 pcs., tank 300 l — 27 pcs of installation
- number of plates of collectors — 4 pcs., tank 400 l — 4 pcs of installation
- number of plates of collectors — 5 pcs , tank 500 l — 1 piece of installation
Details of assembly for all locations can be found in Annex 5 — “Detailed description of the object of the order” and in the technical projects attached thereto.