relaunch of lot 2 boiler rooms of the ZAC of Onet le Château (P2 PFI P3 P1 for a site). The consultation for lot 2 follows a previous procedure without follow-up for technical reasons
energy supply market, operation and maintenance of collective heating, air conditioning, ventilation and domestic hot water installations - relaunch of Lot 2: Boiler rooms of the ZAC d'Onet le Château (P2 PFI P3, P1 for a site)