Activities:
a) removing steel deck cleft, (concreted) bollards, fendering, drowning ladders and various
concrete wells with underground infrastructure behind the existing quay wall;
b) burning down the top, heavily corroded part of the steel sheet piling;
c) inspect anchor systems (anchor system with rods + anchor system with strand anchors)
record findings in a report;
d) execution by means of a newly installed concrete cover apron with a concrete apron on both sides
of the sheet pile; with on the water side reaching up to 30cm below average water level;
e) reinforce sheet piling under water by installing steel slats to be welded there
where appropriate;
f) install bollards 800 kN;
g) applying cathodic protection.
See tender on Negometrix 4.