Lot 1 Road works for the construction of a pavement including preparatory demolition work,
Lot 2 Road works for the construction of a residential street and a neighbourhood square
Lot 3 Gardening and landscaping work for the construction of a residential street and a neighbourhood square
Lot 1: Road works for the construction of a pavement including preparatory demolition workLot 1: Road works for the construction of a pavement including preparatory demolition work
Remove and dispose of 700 m² of bituminous pavement
Remove 460 m² of artificial stone slabs and partially dispose of them or store them partially for reinstallation
Loosening, storing and disposing of 300 m³ of soil
Supply and install 205 m³ of antifreeze gravel
1,765 m² of frost protection layer
Install 25 m curb B6
Installing 155 m of concrete edging
Installing 25 m mastic asphalt gutter
Installing 385 m² of asphalt base and surface courses
Produce 1,185 m² of artificial stone slab flooring
Lot 2: Road construction work for the construction of a residential street and a neighbourhood square, including preparatory demolition workLot 2
Road construction work for the construction of a residential street and a neighbourhood square, including preparatory demolition work
Remove and dispose of 3,150 m2 of bituminous pavement
325 m granite lining and partly store for replacement
Remove 480 m of curb B6 and store it for reinstallation
Loosen, store, dispose of 5,000 m3 of soil
Supply and install 2,350 m3 of antifreeze gravel
Produce 5,485 m2 of frost protection layer
640 m3 substrate (type A) supply, install
315 m3 substrate (type) supply, install
Install 22 settling or seepage shafts
25 pcs root chamber system Installing tree locations
Install 3 pcs trenches
Install 330 m of empty conduits incl. trenches
495 m Installing the B6 curb
Installing 315 m granite liner
270 m edging Installing strip steel
375 m Installing clinker edging
Installing 5,335 m2 of asphalt base and surface courses
1,975 m2 of asphalt surface treatment
Install 600 m2 of natural stone slab flooring
Installing 485 m2 of clinker flooring
Installing 355 m2 of concrete block pavement
Installing 110 m2 of large stone pavement
Making 190 m2 of artificial stone slab flooring
Lot 3 Gardening and landscaping work for the construction of a residential street and a neighbourhood square.Lot 3
Gardening and landscaping work for the construction of a residential street and a neighborhood square.
103 pcs. bicycle rack, incl. install foundation
70 m tree protection bar, incl. install foundation
Supply 15 pieces of waste containers
102 pieces of metal bollards, incl. install foundation
32 pcs. open space furniture chair type Munich, incl. install anchorage
Install 4 special elements of the wooden seating and reclining deck
Plant 9 1st order trees StU 40/45
Plant 20 2nd order trees StU 35/40
Plant 13 3rd order trees StU 30/35
3,800 shrub and perennial plantings
25 m3 topsoil supply, install
Making 360 m2 of vegetation base course
1 year of completion care
2 years of development care (trees StU 40/45 4 years)