A 10, km 23.555-34.126 right RF, maintenance measure construction lot 1, part 1 - road construction, part 2 - bridge construction, part 3 - traffic sign bridges.
Partial service 1 road construction- clear approx. 3 850 m of bushes in the central reservation;
- approx. 2 250 m
- approx. 6 075 m
- approx. 96 200 m
- Renew approx. 94 St. street gully including attachment (various types);
- Replace approx. 685 m of seepage line with a full seepage pipe;
- replace approx. 260 m concrete pipe DN300;
- Refurbish approx. 420 m concrete pipe without trenching (different DN);
- Clean approx. 5 870 m sewer and carry out camera experience (several times);
- Create a shoulder of approx. 20,080 m (different widths and Evd);
- approx. 19,480 m
- approx. 96 200 m
- approx. 79 900 m
- approx. 270 600 m
- approx. 160 900 m
- approx. 162 750 m
- approx. 162 300 m
- approx. 7,300 m
- approx. 195 550 m
- approx. 84 200 m
- approx. 2 250 m
- Pick up approx. 3,060 m of concrete curbs;
- set granite curbs approx. 1 130 m;
- Place approx. 2 120 m concrete curbs;
- Remove approx. 29 760 m marking (different types);
- Break off approx. 57 concrete components without vibration;
- Create a 14.50 m transverse box gutter including a concrete trough.
Partial service 2 bridge construction- Remove approx. 840 guard rail anchors;
- manufacture approx. 747 shear connectors;
- approx. 1 145 m
- approx. 710 m
- coat approx. 55 m of reinforcing steel;
- approx. 1 050 kg RM;
- approx. 800 kg scratch filler epoxy resin;
- approx. 675 m
- approx. 750 m
- approx. 45 m
- approx. 66 m
- approx. 23 m
- 70 m
- approx. 70 m precast concrete protective wall elements, type 94 BE;
- approx. 8 measuring pins;
- approx. 250 m of joint cover / grout;
- approx. 145 m
- approx. 275 m
- approx. 150 M16 compound anchors including drill hole;
- approx. 110 m
- approx. 300 m
- approx. 54 m
- approx. 60 m
- approx. 96 m
- approx. 60 m
- Create about 2 pedestrian traffic sign bridges;
- approx. 130 m