Construction work for cooling towers | Tenderlake

Construction work for cooling towers

Contract Value:
GBP 150K - 250K
Notice Type:
Contract award notice
Published Date:
05 November 2016
Closing Date:
Location(s):
UKI LONDON (UK UNITED KINGDOM)
Description:

LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising five boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.

Exhaust steam from the Energy Centre's four turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.



LondonWaste Ltd owns and operates the EcoPark Energy Centre located in Edmonton, London. The Energy Centre is an Energy-from-Waste facility comprising five boilers burning approximately 500 000 tonnes of municipal residual waste per year, in a continuous 24-hour operation, 7 days per week.

Exhaust steam from the Energy Centre's four turbines is condensed by cooling water passing through the condenser's tubes before returning to the Five Cell Head Wrightson cooling towers and subsequent recirculation. This contract is for the refurbishment of Cells 1 and 2 of the Cooling Towers.

Awarded to:
LWL160NG0716.003
Costain Ltd, Doncaster (UK)
Download full details as .pdf
The Buyer:
LondonWaste Limited
CPV Code(s):
45251150 - Construction work for cooling towers