Subsidized housing construction for state employees of the Free State of Bavaria:
Demolition of an existing building with garages and construction of a total of 63 apartments with underground parking in Traunsteinerstraße 55-61, Munich by Stadibau GmbH.
Area 02: Natural stone work:
- approx. 153 pcs. Interior window sill natural stone laying mortar bed grouting L 140 cm,
- approx. 14 inner window sill natural stone laying mortar bed grouting L 208 cm,
- approx. 300 m
- approx. 50 pieces of natural stone staircase, 120 cm, 7 slopes,
- approx. 25 pieces of natural stone staircase, 120 cm, 3 gradients,
- approx. 2 pieces of natural stone, 130 cm, 10 inclines,
- approx. 5 pieces of natural stone, 130 cm, 6 inclines,
- approx. 150 pieces of contrasting stripes black L = 120 cm,
- approx. 15 contrasting stripes black L = 130 cm,
- approx. 375 m
- approx. 36 m
- approx. 300 m end tile 40 / 600mm lying, bevelled,
- approx. 264 m base of natural stone tiles 100/600 mm D 10 mm, 2nd floor - 4th floor.
Area 03: Concrete stone work
- Approx. 1 350 m
- approx. 1 350 m
- approx. 1 350 m
- approx. 600 m surcharge cut-to-size paving stones.