The Leipheim indoor garden pool was built in the early 1970s and has been in operation largely unchanged since then. In 1997-1999 and 2002, there were partial renovations and extensions (sauna, toddler area).
The aim of the general renovation is to create a “family-oriented sports pool with sauna”. The water areas are to be maintained in their current size, while the toddler area, sauna and outdoor area are to be redesigned to make them more attractive. Technical equipment and bathing water technology in particular no longer meet today's requirements and must be adapted to current standards accordingly.
Essentially, the following services are to be performed:
• the creation of a plant and assembly plan
the production of sample surfaces
• the delivery and installation of a suspended wooden slat ceiling in visual quality
• the delivery and installation of a wooden interior wall cladding in visual quality