Electricity | Tenderlake

Electricity

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
01 September 2023
Closing Date:
10 October 2023
Location(s):
DEA2B Rheinisch-Bergischer Kreis (DE Germany/DEUTSCHLAND)
Description:
Green electricity supply for street lighting 2024-2025

Green electricity supply for street lighting 2024-2025

The subject of the tender is the supply of municipal street lighting (hereinafter abbreviated to SB) with electrical energy from renewable energy sources (hereinafter abbreviated as RE) in the calendar years 2024 and 2025. Currently, around 10,600 light points with an electrical connected load of around 285 kW are installed. The operating time in the calendar year 2022 was around 4,000 hours. This results in an average annual consumption of around 1.05 GWh or around 2.1 GWh in two calendar years.

Download full details as .pdf
The Buyer:
Stadt Bergisch Gladbach
CPV Code(s):
09310000 - Electricity