B33n Paragraph C, BW 92, bridge AS Allensbach-Ost.
- Create a construction pit approx. 2 100 m
- support frame 1 piece;
- reinforcing steel approx. 110 t;
- prestressing steel approx. 15 t;
- Concrete frame handle approx. 110.00 m
- Concrete superstructure approx. 470.00 m
- Concrete cap approx. 50.00 m
- Sealing approx. 480.00 m
- Asphalt protective layer approx. 330.00 m