- the construction of a fitness building on 3 levels,
- the construction of a new high voltage cabin and a storage room,
- the construction of a metal frame and its cover of half a rugby field,
- the development of a synthetic turf rugby pitch, a natural turf rugby pitch and a half synthetic turf rugby pitch,
- development of the surroundings,
- the installation of a new low voltage distribution for the building from the cabin,
- the new installation of special techniques (ventilation, heating, sanitary, access control, fire detection, IT, etc.) for the MCP building.
Lot nº 1: construction of a building for physical conditioning- the construction of a fitness building on three levels,
- the construction of a new high voltage cabin and a storage room,
- the installation of a new low voltage distribution for the building from the cabin,
- the new installation of special techniques (ventilation, heating, sanitation, access control, fire detection, IT, etc.).
Lot nº 2: construction of a cover for a half rugby pitchThe construction of a metal frame and its cover of half a rugby field.
Lot nº 3: development of the surroundingsThe development of the surroundings and direct surroundings of the MCP building.
Lot nº 1: development of rugby fieldsLot 4 includes the development works of a synthetic turf rugby pitch, a natural turf rugby pitch, a half synthetic turf rugby pitch and installation of lighting for rugby pitches. .