Drywall construction work as part of the construction of a new primary school 3.5-speed and a single-field sports hall in 61118 Bad Vilbel
General Construction Description
The district committee of the Wetterau district is planning the new construction of the 3.5-class "New Primary School Bad Vilbel" with school building and single-field sports hall on the property "Fraunhofer Straße 19 / Johannes-Gutenberg-Straße 15".
The construction project is divided into the sub-areas of the school building and the single-field sports hall. The two parts of the building (sub-projects) are each planned to be free-standing, but connected underground via a media tunnel that is not accessible. The sports hall is supplied by the school building.
The four-storey school building (2nd floor, 1st floor, ground floor, basement) and the partly two-storey sports hall are planned as a solid construction mainly in reinforced concrete, the basement school and the floor slab sports hall as WU construction.
The roofs are designed as flat pitched monopitch roofs with extensive greening and a full-surface PV system.
In the area of the future schoolyard area, the construction of a geothermal plant with underlying level drainage is planned.
The remaining schoolyard area will receive an area equipped with various play equipment, a free class and a small playing field.
A compact transformer station will be built in the eastern part of the property. Rainwater retention is planned under the teachers' car park, which is also located there.
In the area of the Johannes-Gutenberg-Straße access road, a garbage enclosure with adjoining space is planned for the storage of gasoline-powered equipment.
The building envelope is insulated all around and equipped with a rear-ventilated façade, highly thermally insulated window and exterior door elements are used.
In addition, highly innovative building technology with sustainable technical systems is used. Geothermal energy is used in combination with a heat pump. Parts of the school building will have a heating and cooling ceiling, and the roof surfaces will be completely covered with PV modules.
Use: 3.5-year primary school with single-field sports hall
Location: Bad Vilbel, Corridor 21, Parcel 256/4, Fraunhofer Straße 19 / Johannes-Gutenberg-Straße 15
Plot size: 5,967 m2
GFA school building: 5,570 m2
BGF Einfeldsporthalle: 1.302 m2
BRI school building: 24.184,70 m3
BRI Einfeldsporthalle: 7.239,47 m3
Building class: 5 (according to HBO - special construction: school building and meeting place)
Building dimensions school building: approx. 19.65m / 72.80m
Gebäudeabmaße Einfeldsporthalle: ca. 29,80m / 29,80m
Number of storeys in school building: 3 full storeys and full basement
Number of storeys of single-field sports hall:
Hallenbereich: 1- geschossig
Adjoining rooms: 2 full storeys
Leistungskennwerte :
Drywall, facing shells, shaft walls: approx. 950 sqm
Stainless steel cassette ceilings: approx. 120 sqm
Wood wool acoustic ceilings, magnesite-bound approx. 1,150 sqm
Grid ceilings, GK panels approx. 285 sqm
Grid field ceilings, mineral slabs, suitable for damp rooms approx. 55 sqm
Term Ausführungszeitraum:
- Leistungsbeginn:
March 2024 technical processing, expected 10th week 2024 (04.03.2024)
(after receipt of the request by the client (§ 5 paragraph 2 sentence 2 VOB/B))
-Completion:
03. CW 2025 (17.01.2025)
265 working days after the start of services VHB 214
For budgetary reasons, the client requires a separate settlement of the two titles "202.1 School Building" and "202.2 Sports Hall". For this purpose, the contractor receives a separate order number for each title in the award letter, which he must state when invoicing.
The delimitation of the two sub-projects is specified by the AG and documented in the planning documents. A separate, separate settlement of the two titles, including the respective invoice-related documents (measurements, weighing slips, billing documents, timesheets, etc.) is binding.
This effort must be taken into account, the specifications are structured accordingly.
Within the framework of the award procedure, it is not possible to submit only one tender for one building. There is no allocation in partial lots, or no lot by lot. The offer (LV) must be priced and submitted for both titles/both buildings.