Central ventilation units for ambulance and emergency room. Installation of appliances, ventilation ducts and outlets
Technical description:
Included in the tender is the ventilation technology for the renovation of the central emergency room on the ground floor and the central office in the basement.
The dismantling of the insulation is included in a separate bill of quantities and is completed before the installation of the temporary ventilation.
The ventilation system of the emergency rooms receives a two-stage filtering, cross-flow heat exchanger, preheater, cooler, reheater.
The ventilation system of the ambulance receives a two-stage filtering, cross-flow heat exchanger, heater and cooler, reheater.
The ventilation system Infectious receives a two-stage filtering, compound heat exchanger, heater and cooler, reheater.
The sewer routing to the floors is carried out in existing shafts, the dismantling in the shafts and the floors is part of this specification.
On the ground floor, the duct system will be rebuilt, the air outlets will be installed swirl outlets.
The MSR is not part of this bill of quantities.