The subject of the contract includes the execution of construction and assembly works aimed at connecting buildings located at 4-6 and 6a Strzelców Bytomskich Street in Świętochłowice to the heating network - as part of the project entitled: "Elimination of low emissions in selected cities of the Silesia-Dąbrowa agglomeration", constituting part of the "Low Emission Elimination Program in the Silesian-Dąbrowa Conurbation" (hereinafter also the Facility) in the scope of: heating networks and connections, heat substations, connection modules without central heating meters, and central heating meters, including through the delivery of equipment, in accordance with the design documentation and handing over the Facility to the Ordering Party for use.
The subject of the contract includes the execution of construction and assembly works aimed at connecting buildings located at 4-6 and 6a Strzelców Bytomskich Street in Świętochłowice to the heating network - as part of the project entitled: "Elimination of low emissions in selected cities of the Silesia-Dąbrowa agglomeration", constituting part of the "Low Emission Elimination Program in the Silesian-Dąbrowa Conurbation" (hereinafter also the Facility) in the scope of: heating networks and connections, heat substations, connection modules without central heating meters, and central heating meters, including through the delivery of equipment, in accordance with the design documentation and handing over the Facility to the Ordering Party for use.
The procedure forms part of contracts concerning the performance of construction and assembly works for the implementation of connections of new facilities to the heating network under the project “Liquidation of low emissions in selected cities of the Silesia Drowbrowska agglomeration”, part of the 'Decommissioning Programme low emission in the Silesian and Dust Browska conurbation”. The total value of these proceedings exceeds EUR 5,382 000,00.
A detailed description of the Subject of the Order is set out in the Draft Agreement (Annex 3 to the SWZ), in particular by: The scope of the Subject of the Agreement (Annex No 1 to the Project Agreement) and the Technical Documentation (Annex No 2 to the Project Agreement).
Required terms:
heat supply to all buildings: until 18.09.2023;
transfer of the room for the construction of the heat substation and the connection module: by 01.08.2023;
complete completion of works and final acceptance: by 13.10.2023.